Husqvarna TE 250-310 2012 I.E. Workshop Manual page 191

Table of Contents

Advertisement

ENGINE REASSEMBLY
TE 250 - 310 2012 I.E. / TE 250 - 310 2012 I.E. USA
TC 250 2012 - TC 250 2012 I.E. USA
TXC 250 - 310 2012 I.E. USA
Operate shifter and transmission shaft to test gearbox for proper operation.
Refit the ratchet assembly (10) together with the plate, making sure ratchets and
springs are in the correct positions.
Tighten the upper screw (11) using a 4 mm Allen wrench (Loctite 243, 10 Nm,
1.0 Kgm, 7.2 ft/lb).
Tighten the lower screw (12) using an 8 mm wrench (Loctite 243, 10 Nm, 1.0
Kgm, 7.2 ft/lb).
Turn the engine over and install the gear shift lever oil seal (13) and its circlip
(14).
Workshop Manual Ed. 12-2011
H.29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2012Tc 250 2012 i.e. usaTxc 250-310 2012 i.e. usa

Table of Contents