Coil Windings Resistance Inspection (Tc) - Husqvarna TE 250-310 2012 I.E. Workshop Manual

Table of Contents

Advertisement

TE 250 - 310 2012 I.E. / TE 250 - 310 2012 I.E. USA
1
+
-
+
Workshop Manual Ed. 12-2011
ELECTRICAL SYSTEM
TC 250 2012 - TC 250 2012 I.E. USA
TXC 250 - 310 2012 I.E. USA

Coil windings resistance inspection (TC)

Disconnect the connector (1) from the coil (2).
-
Remove the coil (2) as described in the relevant paragraph.
-
Measure primary and secondary winding resistance with a meter.
2
-
Primary winding resistance: 0,09
-
Secondary winding resistance: Open circuit.
If resistance is outside the specified limits, replace the coil.
-
Terminal cap resistance: 5,7 K
If resistance is outside the specified limits, replace the cap.
H10125
H11005
H11007
±20% at 20°C.
M.26
±15% at 20°C.
H11011

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2012Tc 250 2012 i.e. usaTxc 250-310 2012 i.e. usa

Table of Contents