Mounting The Robot - adept technology AdeptViper s650 User Manual

Table of Contents

Advertisement

Chapter 3 - Robot Installation
3.4

Mounting the Robot

+0.012
2X Ø6
- 0
R20
1. See
Figure 3-2
position where the robot unit is to be secured.
• Drill four bolt holes (M10), 20 mm deep or more
• Drill a dowel pin hole Ø4, H7 for diamond shaped pin, 10-mm deep or more
• Drill a dowel pin hole Ø6, H7 for internally threaded positioning pin, 10-mm
deep or more
2. Locate two alignment pins, one round and one diamond-shaped, supplied in the
accessory kit.
3. Drive the diamond-shaped pin into the Ø4, H7 hole so that it orients as shown in
Figure
3-2.
4. Drive the internally threaded alignment pin into the Ø6, H7 hole.
NOTE: Be sure to drive the alignment pins. It can minimize positional
deviations that may be caused by the removal/installation of the robot
unit for maintenance or the vibration during operation.
30
AdeptViper s650/s850 Robot User's Guide, Rev A
200
160
66 ±0.05
Diamond-shaped pin
Figure 3-2. Mounting Hole Pattern for Robot
for the dimensions of the mounting holes in the robot mounting
142.3
4X Ø12 THRU
For M10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adeptviper s850

Table of Contents