adept technology AdeptViper s650 User Manual page 29

Table of Contents

Advertisement

Step
Procedure
4
As shown at right, place a waste cloth
on the second arm and pass the wire
through the two eyebolts.
Note: Before transporting the robot,
check that the path to the target
position is free of obstacles.
5
Worker A: Remove the four bolts
while supporting the robot unit to
prevent it from getting overturned.
6
Worker B: Operate the crane and
move the robot unit to the target site.
7
Worker B: Put the robot unit down in
the target position.
Worker A: Temporarily secure the
robot unit with four bolts.
8
Secure the robot unit according to the
instructions in
Section 3.4 on page
9
Remove the eyebolts from the robot
unit.
AdeptViper s650/s850 Robot User's Guide, Rev A
Drawing
Eyebolts
Robot Mounting
Bolts
30.
Caution: Before running the robot unit, be
sure to remove the eyebolts. Otherwise, the
robot arm will strike against those eyebolts.
Transporting the Robot
Wire
(Belt sling)
Waste Cloth
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adeptviper s850

Table of Contents