Completing The Installation - IBM System x3650 M4 BD Type 5466 Installation And Service Manual

Table of Contents

Advertisement

Completing the installation

Use this information to complete the installation.
About this task
To complete the installation, complete the following steps:
Procedure
1. If you removed the air baffle, reinstall it (see "Installing the air baffle" on page
80).
2. If you removed a PCIe riser-card assembly, reinstall it (see "Installing a PCI
riser-card assembly" on page 81).
3. If you have the optional hot-swap rear hard disk drive cage installed, rotate it
down (see "Rotating the hot-swap rear hard disk drive cage down" on page
82.
4. If you removed the server top cover, replace it (see "Installing the server top
cover" on page 84).
5. Install the server in the rack cabinet (see the Rack Installation Instructions that
come with the server for instructions).
6. To attach peripheral devices and connect the power cords, see "Front view"
on page 16).
7. Update the server configuration (see "Updating the server configuration" on
page 85).
8. Slide the server back into the rack, if necessary.
9. Start the server. Confirm that is starts correctly and recognizes the newly
installed devices, and make sure that no error LEDs are lit.
10. (IBM Business Partners only) Complete the additional steps in "Instructions
for IBM Business Partners" on page 24.
Note: Remember to route the power cord through the cable retainer clip so
that it does not accidentally become disconnected.
Figure 65. Power cord
Chapter 2. Installing optional devices
79

Advertisement

Table of Contents
loading

Table of Contents