Installing TFTP server or obtaining USB CD-ROM drive

Upgrading Communication Manager on an S8300 to release 3.0 normally requires remastering
the S8300B hard drive. After remastering the drive, the remastering program looks for the
Communication Manager software files on:
An external USB CD-ROM drive, or
The laptop, if a TFTP server is installed
You must have either the Avaya TFTP server software installed on your laptop or take a USB
CD-ROM drive to the site. If you do not already have the Avaya TFTP server installed on your
laptop, you can obtain the software from the Avaya Support website and install it as described in
Appendix D: Install the Avaya TFTP
!
Important:
If the new S8300B that you will be installing has Communication Manager
Important:
software installed on its hard drive, you must use an external USB CD-ROM drive
instead of the TFTP server on your laptop. See
page 213 for more information.

Collecting upgrade information

Filling in the EPW, if upgrading from release 1.1

If you are upgrading from release 1.1, you will need to do a complete configuration of the
S8300B after the upgrade to release 3.0. The most efficient way to do this is to fill in the
Electronic Pre-installation Worksheet (EPW) and use the Avaya Installation Wizard to complete
the server configuration task. You should download the latest version of the EPW from
support.avaya.com/avayaiw/
information before going to the site. Any missing information can be added to the EPW at the
site by viewing the configuration screens using the Maintenance Web Interface before the
upgrade.

Planning forms provided by the project manager

The Project Manager should provide you with forms that contain all the information needed to
prepare for this installation. The information includes IP addresses, subnet mask addresses,
logins, passwords, people to contact, the type of system, and equipment you need to install.
Verify that the information provided by the project manager includes all the information
requested in your planning forms.
server.
to your laptop. You can fill in most or all of the configuration
Before going to the customer site
Accessing the Server CD