Suzuki 2006 SX4 Service Manual page 844

Hide thumbs Also See for 2006 SX4:
Table of Contents

Advertisement

5B-32 Manual Transmission/Transaxle:
6) Disassemble synchronizer sleeve & hub assembly.
7) Take out 1st gear needle bearing from shaft.
8) In order to remove right bearing (1) from
countershaft, grind with a grinder (2) one part "a" of
right bearing (1) as illustrated till it becomes thin.
CAUTION
!
Be careful not to grind too far not to damage
the shaft (3).
3
1
9) Break with a chisel (1) the thin ground right bearing
(2) and it can be removed.
Reassembly
1) Clean all components thoroughly, inspect them for
any abnormality and replace with new one as
necessary.
2) Check clearance "a" between synchronizer ring (2)
and gear (1), key slot width "b" in synchronizer ring
and each chamfered tooth of gear and synchronizer
ring and replace with new one, if necessary. Also,
check gear tooth.
Clearance "a" between synchronizer ring and
gear
Standard: 1.0 – 1.4 mm (0.040 – 0.055 in.)
Service limit: 0.5 mm (0.020 in.)
Key slot width "b"
Standard: 10.0 – 10.2 mm (0.394 – 0.401 in.)
Limit: 10.45 mm (0.411 in.)
2
"a"
3
1
I5RW0A520035-01
1
2
I5RW0A520036-01
3) Put the synchronizer outer ring (1), inner ring (3) and
the cone (2) together and then measure the step
difference between the outer ring and the inner ring.
And also check each chamfered tooth of gear and
synchronizer ring and replace with new one, if
necessary. Also, check gear tooth.
Difference between synchronizer outer ring and
inner ring (2nd)
Standard "b": 0.95 – 1.25 mm (0.036 – 0.048 in.)
Service limit "b": 0.5 mm (0.019 in.)
4) To ensure lubrication of countershaft (1), air blow oil
holes (2) and make sure that they are free from any
obstruction.
I5JB0A520079-01
I2RH01520059-01
I2RH01520060-01

Advertisement

Table of Contents
loading

Table of Contents