Engine Assembly
Engine Installation (cont'd)
31. Loosely install the alternator belt.
32. Loosely install the P/S pump belt and pump.
33. Adjust the alternator belt (see page 4-39) and the
Power Steering (P/S) pump belt (see page 17-12).
34. Install the starter cable (A), wire harness clamp (B),
ground cable (C) and back-up light switch
connectors (D).
D
35. Connect the engine wire harness connectors on the
right side of the engine compartment.
36. Push the ECM/PCM connectors through the
bulkhead, then install the grommet (A).
A
6x 1.0 mm
12 N-m (1.2 kgfm, 8.7 Ibfft)
37. Connect the ECM/PCM connectors.
5-16