ZiLOG System 8000 Hardware Reference Manual page 68

Central processing unit
Hide thumbs Also See for System 8000:
Table of Contents

Advertisement

CPU
Zilog
CPU
2.
MMU -- All accessable internal registers and
the
seg-
ment trap functions are tested.
3.
Memory Test -- All locations of memory are
tested
for
read and write functions.
4.
ECC Test -- The error
detection
capabilities
of
the
system are tested.
5.
Peripheral Equipment Test -- A
cursory
check
of
the
System
8000
disk, tape, and storage module controller
boards.
If the SPUD detects a problem, an error message is displayed
on
the
console
of
the
System Administrator (ZEUS super-
user).
The error messages and descriptions
are
listed
in
Table
5-1.
If an error message is displayed, powerdown the
system and verify that the cable connectors
and
PC
boards
are
properly
inserted.
If
the error message remains and
more information is needed to isolate the problem, refer
to
the
SADIE diagnostics in the System 8000 Hardware Reference
Manual.
When the problem is
isolated
to
the
CPU
board,
power
down
and
replace
the
board.
Return the defective
board to the factory for repair.
NOTE
ZEUS is installed on disk at the factory.
If SPUD
runs
correctly, pressing START also activates the
automatic ZEUS boot-up procedures.
5-2
Zilog
5-2

Advertisement

Table of Contents
loading

Table of Contents