Configuration 2 To Configuration 7 - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

Conversion configurations
Ê Insert the HDD cage.
Ê Remove cable C10 from the connector MLC1 of the 4x 2.5-inch SAS
backplane (1).
Figure 323: Connecting SAS cables
Ê Connect cable C10 to the connector MLC2 of the SAS controller (1).
Ê Connect the cable C9 to X1 of the 4x 2.5-inch SAS backplane (2) and the
MLC1 of the SAS controller (3).
Ê Route the cables as shown.

15.3.2 Configuration 2 to configuration 7

I
The configuration 2 must include a SAS controller. Otherwise you must
install a SAS controller as described in section
controller" on page
510
203.
Upgrade and Maintenance Manual
"Installing the SAS RAID
RX300 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents