Concluding Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

9.5.1.6

Concluding steps

Perform the following procedures:
"Mounting the server cover" on page 76
Ê
"Sliding the server into the rack" on page 80
Ê
If the server has been completely removed from the rack for maintenance
purposes, reinstall and secure it in the rack as described in section
"Mounting the server in the rack" on page
"Connecting the server to the power source" on page 81
Ê
Ê If applicable, update the firmware of the RAID controller that has been
connected to the BBU as described in section
firmware" on page
"Enabling SVOM boot watchdog functionality" on page 101
Ê
"Closing the rack door" on page 84
Ê
Note on BBU charging and calibration
The BBU may be deeply discharged due to extended storage time and wrongly
show as bad or defective in the ServerView RAID Manager.
In this case, the BBU will automatically enter a trickle charge cycle for recovery.
This initial charge may take up to 8 hours before the BBU will initiate a
recalibration cycle.
Ê Enter the ServerView RAID Manager and check the current BBU status.
I
For further information, please refer to the "ServerView Suite RAID
Management" user guide, available online at
http://manuals.ts.fujitsu.com.
Ê If the BBU is shown as bad or defective, do not power off the server for at
least 8 hours to allow the charge and calibration cycles to finish.
Ê If the BBU status does not change after 8 hours, please try to initiate the
recalibration process manually using the ServerView RAID Manager.
I
If this procedure still does not fix the BBU status, please contact your
local Fujitsu customer service partner.
RX300 S7
96.
Upgrade and Maintenance Manual
Expansion cards and backup units
77.
"Updating RAID controller
233

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents