Avaya Communication Manager controlled maintenance

Port Insertion

Whenever maintenance software initiates a request to place a port into service, a terminal
download action is started on that terminal if that terminal is programmable. This port insertion
action occurs under the following circumstances:
A digital line media module that is physically inserted into the system has ports currently
administered for programmable terminals.
If more than 20 port insertion requests are received within a few seconds, a global
download request is started up as a background task. This action updates all programmable
terminals instead of just those being inserted. This is done to avoid system overload for
situations where there is massive board insertion. This could occur when connectivity to an
EPN is reestablished after that EPN was down.
A station port is added to the system by a "add station" or "change station" command.
A TTI port is activated.

Audits

As part of periodic maintenance, the hardware status audit test queries programmable terminals
to determine which levels and/or options are being used. If the reported values are not equal to
the administered values, the system will initiate a terminal download action. This audit does
NOT check the parameters used for softkeys.

Activation of TTI

A terminal is downloaded automatically when it is activated using the Terminal Translation
Initialization feature. Therefore, no special user actions are required for TTI.
Plugging the station cord into a terminal does not automatically cause the terminal to be
downloaded. If this terminal has factory defaults or if the terminal has been previously
downloaded with parameters different than those desired, use one of the demand download
actions described below to download the terminal.

Demand Download Actions

Busyout/Release Command

A maintenance demand busyout/release request for a station will cause the terminal to be
downloaded regardless of its previous download status.