Station Status And Translation Audits And Updates Test (#36) - Avaya G250 Maintenance Manual

Media gateways
Hide thumbs Also See for G250:
Table of Contents

Advertisement

Station Status and Translation Audits and Updates Test (#36)

This test updates the analog port's message lamp state (if it has one) and translations with
information in the software.
Table 37: TEST #36 Station Status and Translation Audits and Updates
Error
Test
Code
Result
ABORT
1004
ABORT
1005
ABORT
1006
ABORT
2000
ABORT
2100
ABORT
Description/ Recommendation
Necessary system resources could not be allocated to run this test.
Retry the command at 1-minute intervals no more than 5 times.
If the test continues to abort, escalate the problem.
A valid call seized the port during the test and aborted the test.
Use the display board GGGVSpp command to determine the station
extension.
Use the status station extension command to determine the service
state of the port.
If the port is in use, wait until the port is idle before testing. Retry the
command at 1-minute intervals no more than 5 times.
If the test continues to abort, escalate the problem.
This test was aborted due to a configuration problem. The test is not
applicable for this type of analog port. This error can be ignored.
The port is out-of-service. The busy station extension command has
been given to this port.
Look for error type 18 (port busied out) for this port. If this error is
present, release the port (release station extension), and run the test
again.
Make sure that the terminal is connected and in service, and then
retest.
Response to the test request was not received within the allowable
time period.
System resources required to run this test are not available.
Retry the command at 1-minute intervals no more than 5 times.
If the test continues to abort, escalate the problem.
AN-LN-PT (Analog Line Port)
1 of 2
Issue 1.1 June 2005
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

G350

Table of Contents