Monitoring The Plc Program - Mitsubishi Electric MELDAS C6 Programming Manual

Hide thumbs Also See for MELDAS C6:
Table of Contents

Advertisement

1. PLC Development Environment Using GX Developer

1.3.8 Monitoring the PLC Program

There are no MELDAS-specific operations to monitor a PLC program. Refer to the GX Developer
operating manual for the operation methods. For usable functions, refer to "1.1.3.2 Function Support
Conditions (on-line section)". This section explains the operation procedure outline and precautions.
(1) Operation procedure
Perform the following operation from GX Developer to start monitoring.
(a) Display the ladder program to be monitored and move to the circuit part to be monitored.
(b) Perform the following operation to start monitoring.
[Online] → [Monitor] → [Monitor mode] or F3
(c) Perform the following operation to stop monitoring.
[Online] → [Monitor] → [Stop monitor] or Alt + F3
(Note) If the ladder program being run by the CNC differs from the one being displayed on GX
Developer, monitoring will not result in an error but will continue.
1.3 Developing PLC Programs
- 22 -
Get other manuals https://www.bkmanuals.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas c64

Table of Contents