Installing The Terminal Block - Siemens SIMATIC Distributed I/O ET 200eco PN Operating Instructions Manual

Hide thumbs Also See for SIMATIC Distributed I/O ET 200eco PN:
Table of Contents

Advertisement

2.4

Installing the terminal block

Properties
The terminal block connects the ET 200eco PN and supplies the I/O device with power.
The terminal block
• can be installed separately,
• or be screwed on to each I/O device.
Requirements
Note that you must wire the terminal block before you install it.
Tools required
Recessed head screwdriver, medium size
Installing the terminal block separately
You install the terminal block separately.
Remove the screws and then screw them in again at the bottom of the housing.
Figure 2-5  Installing the terminal block separately
Installing the terminal block on an I/O device
Install the terminal block vertically on a housing of 30 mm width, or horizontally on a housing
of 60 mm width.
An M12 cap is attached to the bottom of the terminal block to implement the corresponding
degree of protection. Make sure that the M12 cap is not attached to the terminal block
ET 200eco PN
Operating Instructions, 06/2022, A5E01250250-AN
Installing
2.4 Installing the terminal block
25

Advertisement

Table of Contents
loading

Table of Contents