Interrupts - Siemens SIMATIC Distributed I/O ET 200eco PN Operating Instructions Manual

Hide thumbs Also See for SIMATIC Distributed I/O ET 200eco PN:
Table of Contents

Advertisement

IO-Link Master
11.2 IO-Link Master (6ES7148-6JD00-0AB0)
Port configuration
With a 4 IO-L 4×M12 IO-Link Master as of firmware version V1.1 you can commission the IO-
Link submodules (ports) of the IO-Link Masters or the connected IO-Link Devices in two
different ways:
• Port configuration without S7-PCT
• Port configuration with S7-PCT
Port configuration without S7-PCT
Requirement
You have activated the "Port configuration with S7-PCT" check box at the configuration of the
IO-Link Master submodules in STEP 7.
Procedure
You carry out the configuration of the IO-Link Master submodules directly in STEP 7:
• Activating diagnostics
• Port mode:
– Operation in "IO-Link auto start" mode (pre-selected)
– Operation in "IO-Link manual" mode
NOTE
Changing settings of IO-Link devices
If in the further course of the project you want to carry out settings at the connected IO-Link
Devices with S7-PCT, you require S7-PCT as of V3.5 with Hotfix 1.
Port configuration with S7-PCT
Requirement
You have deactivated (default) the "Port configuration without S7-PCT" check box for the
configuration of all the IO-Link Master submodules in STEP 7.
Procedure
You carry out the port configuration of the IO-Link Master via the Port Configuration Tool
S7-PCT as of V3.2.
You can find more detailed information on the submodule configuration in the section
"Configuration (Page 213)".
11.2.5

Interrupts

Introduction
According to IEC 61131-9, IO-Link devices are able to generate events of the types error,
warning and notification. These events are mapped directly to the interrupts of the assigned
submodule.
218
Operating Instructions, 06/2022, A5E01250250-AN
ET 200eco PN

Advertisement

Table of Contents
loading

Table of Contents