<Work procedure 2-8>
24) Loosen the 2 screws and remove the plate and the 2 external heat cleaning rollers.
25) Remove the plate from the external heat cleaning roller.
26) Remove the following parts from the external heat cleaning roller.
- 2 E-rings
- 2 washers
- 2 bearings
27) Assemble 2 new External Heat Cleaning Rollers together with the parts removed in step 26 in reverse
order.
28) Install the 2 new External Heat Cleaning Rollers in reverse order.
8 / 9