<Work procedure 2-8>
21) Install the removed External Heat Roller (Upper) and External Heat Roller (Lower) in reverse order.
CAUTION: Points to note when installing the External Heat Rollers to the External Heat Unit
1) Install the flange of bearing outside the plate.
2) Make sure to install the roller retaining spring inside the flange of the bearing.
22) After installing the External Heat Roller Unit, replace the 2 External Heat Cleaning Rollers.
23) Remove the 2 screws and the fixing right cover.
7 / 9