<Work procedure 2-3>
10) Remove the patch sensor unit.
11) Put a paper between the fixing feed unit and the ITB frame.
12) Remove the ITB.
13) While rotating the Secondary Transfer Inner Roller [1], clean the whole circumference in the vertical
direction with dry lint-free paper.
3 / 8