Western Digital ActiveScale X100 Installation Manual page 93

Hide thumbs Also See for ActiveScale X100:
Table of Contents

Advertisement

ActiveScale™ X100 Installation Guide
identical, adding two scale up kits simultaneously results in link-local IP address
conflicts.
Warning: Components in the scale up kit might have newer firmware than your
existing components have. This procedure does not upgrade or downgrade any
firmware.
Warning: If a scale up or scale out job is already in progress, wait until the
current job is complete to start the multi-site scale up job.
Warning: Do not start a log collection job while a scale up job is running.
1. Verify the health of the system.
a. Make sure all nodes are online.
b. Click Configuration > System.
c. In the General Info section, under Health Check, click Run.
d. Monitor the status of the health check job in the Jobs pane.
e. If the health check job has errors, stop. Contact Western Digital Support for help.
2. Start the scale up wizard to provision newly populated sleds one by one.
a. Click Configuration > Upgrade.
b. In the System Expansion section, scroll down to Scale Up.
c. Click Start.
Figure 7-98. Starting a scale up
93

Advertisement

Table of Contents
loading

Table of Contents