ActiveScale™ X100 Installation Guide
The wizard displays a screen with a checklist of steps that you should have completed already.
5. If you have completed the steps listed, click Provision.
If you have not completed all steps in the checklist displayed, click Back to Let's Get Started, and
complete them first.
Figure 7-101. Scale Up: Ready to provision
6. Navigate to the Jobs page, and wait until the scale up job indicates success or failure.
Tip: This takes about 1 hour for each newly installed sled column.
When the scale up job succeeds, its Progress bar is 100% and its Results field is Success.
Figure 7-102. Scale up: Job success