ActiveScale™ X100 Installation Guide
On each System Node, connect your fiber optic cable for Public Network 1 to the SFP+ transceiver in
SFP+ Port 3 (N3), and your fiber optic cable for Public Network 2 to the SFP+ transceiver in SFP+ Port
1 (N1).
Figure 5-36. System Node ports for Public Network 1 and 2
For racked ActiveScale X100 systems, feed the data center's network cables through the cable routing
brush strip on top of the rack:
Figure 5-37. Network connection through top of rack
Figure 5-38. Cable routing brush strip
Cable Routing
Brush Strip
Rear
The figure below illustrates the network connectivity of the first system in a single site deployment.