Western Digital ActiveScale X100 Installation Manual page 54

Hide thumbs Also See for ActiveScale X100:
Table of Contents

Advertisement

ActiveScale™ X100 Installation Guide
Tip: Pre-login configuration takes a minimum of 12 hours.
Important: The systems at all sites must be completely powered on at this point.
Important: The 10GbE cables from SFP+ ports 1 and 3 on each System Node
must not be connected to your network(s) at this point, to avoid possible IP
conflicts.
Tip: All fields in the pre-login configuration wizard are mandatory unless
otherwise noted.
Warning: Do not use your web browser's Back or Forward buttons to navigate
through the wizard.
1. At each site, configure a connection to the default link local IP address of the eth2 network interface
on the first (lowest) System Node (System Node 1).
a. Connect an RJ45 (CAT6) cable from your laptop's Ethernet port to the eth2 port on System Node
The figure below illustrates the location of the System Nodes.
Figure 5-54. Location of System Nodes: Call out # 4
54

Advertisement

Table of Contents
loading

Table of Contents