Re-Balancing The Pdus; Three-Phase Across Two Pdus; Table 9-5. Three-Phase Across Two Pdus - Pdus 1 And 2 - Western Digital ActiveScale X100 Installation Manual

Hide thumbs Also See for ActiveScale X100:
Table of Contents

Advertisement

ActiveScale™ X100 Installation Guide
2. Line up the PDU over the mounting holes.
3. Place the mounting pegs over the rack PDU mounting points and pull down.
Figure 9-6. Installing a three-phase PDU
4. Secure the PDUs to the rack.

9.6.1 Re-balancing the PDUs

Important: This section assumes that the power running into the PDUs is
properly balanced in your data center's power grid, and can balance the load over
the PDUs in case of PDU failure.
The tables in this section describe how components should be plugged into the PDUs after installing
System Expansion Node kits.
Note: Plug Storage Enclosure Basics and their corresponding Storage Nodes into
the same segment of the PDU.

9.6.1.1 Three-phase across two PDUs

Table 9-5. Three-phase across two PDUs - PDUs 1 and 2

Plug
Current (A)
C-13
1.16
C-13
1.15
C-13
1.15
C-13
4.3
C-13
1.16
C-13
4.3
C-13
1.06
14.28 Total
Branch ZX
Component
System Expansion Node 3 28
Storage Node 6
Storage Node 5
Storage Enclosure Basic 6 25
System Node 3
Storage Enclosure Basic 5 23
System Interconnect 2
Branch YZ
118
Port
Time on (s)
30
27
60
26
50
40
24
20
10
22
0