Panasonic FP Series Programming Manual page 993

Hide thumbs Also See for FP Series:
Table of Contents

Advertisement

System register instructions
When a commercial RS232C/RS485 converter is being used to carry out communication between
Usage
Example
a personal computer and the FP-, this instruction is used to return the PLC response after
switching of the enable signal has been completed on the converter side.
External
device (PC)
Keyword setting
Port used
TOOL: Tool port
COM1: COM 1 port
COM2: COM 2 port
Response time
WAIT0 to WAIT999: (n: 0 to 999)
If the communication mode has been set to the computer link mode, the set time is the scan time x
n (n: 0 to 999).
If the communication mode has been set to the PLC link mode, the set time is n s (n: 0 to 999).
If n = 0, the delay time set by this instruction will be set to "None".
Precautions during programming
This instruction is valid only if the setting on the controller side has been set to
the computer link mode or the PLC link mode. It is invalid in the general
communication mode.
Executing this instruction does not change the settings in the system registers.
We recommend using differential execution with this instruction.
When the power supply to the PLC is off, the settings set by this instruction are
cleared. (The set value will become 0.) If the mode is switched to the PROG.
mode after the instruction has been executed, however, the settings will be
retained.
If a commercial RS232C/RS485 converter is being used in the PLC link mode,
this instruction should be programmed in all of the stations (PLCs) connected to
the link.
Separate first and second keywords with a comma "," and do not use spaces.
992
Commercial
RS232C/RS485 converter
Command
Response
Σ
FP
Σ
Σ
FP
FP
TOOL, WAITn

Advertisement

Table of Contents
loading

Table of Contents