Epson SC-F9200 Series Service Manual page 298

Large format color inkjet printer
Hide thumbs Also See for SC-F9200 Series:
Table of Contents

Advertisement

SC-F9200 Series
6.
Check the CR TIMING BELT while the CR UNIT is running.
The belt runs in the middle of the driven pulley:
Finish. Perform the <belt tension measurement>
When the belt moves back and forth between both sides or runs on either side:
Go to
Step
7.
Driven pulley
Upper
Figure 4-15. Slant Adjustment of Driven Pulley
ADJUSTMENT
(Step
9).
CR TIMING
BELT
Driven
pulley
CR Related Adjustments
7.
Loosen the screw A of the driven pulley holder.
8.
Adjust the Driven Pulley slant with the slant adjusting screw. After adjusting the
slant, attach the screw A and return to
The belt leans to the rear side of the driven pulley:
Rotate the screw in a counterclockwise.
The belt leans to the front side of the Driven Pulley:
Rotate the screw in a clockwise.
Screw A
Figure 4-16. Screw A and slant adjusting screw
SE Group Confidential (Related Staff Only)
Revision C
Step
4.
Slant adjusting
screw
298

Advertisement

Table of Contents
loading

Table of Contents