SC-F9200 Series
3.4.9.2 Reel Unit
1.
Remove the nine screws, and remove the Reel Unit.
A) Special screw: 9 pcs
When installing the Reel Unit, confirm the following.
On the left side of the Reel Unit, insert the dowel of the frame
into the positioning hole on the Reel Unit.
On the right side of the Reel Unit, insert the dowels of the frame
into the positioning grooves of the Reel Unit.
DISASSEMBLY & ASSEMBLY
A
Disassembly and Assembly Procedure
- Outside -
Positioning hole and dowel
A
A
- Inside -
A
A
Reel Unit
Figure 3-200. Removing the Reel Unit (SC-F7100 Series)
SE Group Confidential (Related Staff Only)
Revision B
Dowel and positioning groove
A
A
Dowel and positioning groove
A
A
245