Honda V65 Magna-VF1100C 1983 Shop Manual page 71

Table of Contents

Advertisement

Reconnect the throttle linkage between the No.
1
and No. 2 carburetors, using new cotter pins.
Coat new 0-rings with oil and install them on the
fuel and air joint pipes.
Put the No. 3 and No. 4 carburetors together with
the
joint
pipes.
Loosen the synchronization adjusting screws until
there is no tension.
Install the synchronization springs.
Install the thrust
springs
between the throttle valve
shafts.
FUE
L
SYSTEM
THROTTLE LINK
No. 2 CARBURETOR
COTTER PINS
No.1 CARBU RETOR
FUEL JO INT PIPE
AIR JO INT PIPES
THRUST SPRING
No.3 CARBUR ETOR
No.3 SYNCHRO
NI ZATI ON
SPR ING
4-13

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents