Equipment Log; Tools Recommended For Upgrading Your System; Preparing Your System For Upgrade - NEC Express5800 120Li User Manual

Hide thumbs Also See for Express5800 120Li:
Table of Contents

Advertisement

User Guide
Electronic devices can be easily damaged by static electricity. To prevent damage, keep
them in their protective packaging when they are not installed in your system.

Equipment Log

Use the equipment log form located at the end of this guide to record the model and
serial number of your system, all installed options, and any other pertinent information
specific to your system. You will need this information when configuring your system.
Tools Recommended
for Upgrading Your System
Depending on the upgrade, you will need one or more of the following tools:
■ Phillips screwdriver (#1 bit and #2 bit)
■ Flat-head screwdriver
■ Small needle nose pliers
■ Pen or pencil
■ ESD workstation or antistatic wrist strap (recommended)

Preparing Your System for Upgrade

To prepare your system for installation or removal of system component:
1. Observe the safety and ESD precautions listed under General Information and
Static Precautions at the beginning of this chapter.
2. Shutdown the operating system (OS).
3. If necessary, press the power on/off switch on the front panel of the server (see
See "Powering On Your System" on page 66.
4. Power off the peripheral devices.
5. Unplug the system power cord(s) from the AC wall outlet(s).
control unit such as an UPS (Uninterruptible Power Supply),
refer to the UPS user's guide for proper power-off procedures.
6. Unplug all the I/O cables connected to the rear panel of your system.
Note: If the system power cord is connected to a power
). The power-on LED goes out.
110
www.nec-computers.com

Advertisement

Table of Contents
loading

Table of Contents