Preparing Your System For Upgrade; Equipment Log; Removing A Side Panel - NEC TM1200 User Manual

Table of Contents

Advertisement

Preparing Your System for Upgrade

Depending on the upgrade, you will need one or more of the following tools:
n
Phillips screwdriver (#1 bit and #2 bit)
n
Flat-head screwdriver
n
Small needle nose pliers
n
Pen or pencil
n
ESD workstation or antistatic wrist strap (recommended)

Equipment Log

Use the equipment log form located at the end of this manual to record the
model and serial number of your system, all installed options, and any other
pertinent information specific to your system. You will need this information
when configuring your system.

Removing a Side Panel

To install options in your system, you must remove the side panel on the left
side of the system (as viewed from the front). The side panel on the right side of
the system (as viewed from the front) only has to be removed when adding
removable media devices or a second power supply. The right side panel
removes in the same manner as the left side panel.
For proper cooling and airflow, do not operate the system
with the side panels removed. Always replace the panels
before powering on the system.
If you are removing the side panel after the system is set up,
you must first power off the system and all external devices
and then Unplug the system power cord
To remove a side panel:
1. Power off the system and ensure it is disconnected from the ac wall outlet.
2. The side panel is secured to the chassis with two screws. Remove the screws
securing the side panel. Save the screws for reattaching the side panel.
3. Slide the side panel toward the rear of the chassis. This unlocks the locking
fingers behind the side panel.
CAUTION
WARNING
Upgrading Your System 4-3

Advertisement

Table of Contents
loading

Table of Contents