2GN/2GP/2GR-1
1-2-2
Unpacking and installation
(1) Installation procedure
Start
Connect the power cord.
Unpack.
Install the fixing brackets.
Remove the tapes, spacers and pad.
Install the optional paper feeder.
Install the stylus pen and penholder.
Carry out initial developer setting
Release the lever holding mirror 1 and 2 frames.
(maintenance item U130).
Release of cassette lift plate.
Output an own-status report
(maintenance item U000).
Load paper.
Exit maintenance mode.
Install the toner container.
Print out the user setting list.
Install the waste toner box.
Make test copies.
Install the optional original cover or the DP.
Attaching the language label
(230 V specifications only).
Install other optional devices.
Completion of the machine installation.
1-2-2