NEC NEAX 2000 IPS Installation Manual page 490

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

Switch Settings
SWITCH NAME
SENSE
(Rotary SW)
F
4
NOTE 1
MB (Toggle SW)
ON
NOTE 2
SW1
(Piano SW)
OFF
4
3
2
1
ON
The figure in the SWITCH NAME column and the position of
umn indicate the standard setting of the switch. When the switch is not set as shown by the figure and
, the setting of the switch varies with the system concerned.
NOTE 1:
Set the groove on the switch to the desired position.
NOTE 2:
When the power is on, flip the MB switch to ON (UP position) before plugging/unplugging the
circuit card.
NOTE 3:
When the U-interface CS (ZT) is used, one CSH card per system must be set to the SW1-1 switch
ON. And mount the CSH card which SW1-1 is set to ON into PIM0.
NOTE 4:
When the S-interface CS (ZT) is used, set the SW1-1 switch to OFF.
SWITCH
SETTING
NUMBER
POSITION
4-F
Set the switch to match the AP Number (04-31) to be
set by CM05.
SW1-4: ON
AP No.
SW1-4: OFF
SW No.
0-3
Not used
UP
DOWN
1
ON
NOTE 3
OFF
NOTE 4
2
OFF
3
OFF
ON
4
OFF
FUNCTION
04 05 06 07
08 09 10
20 21 22 23
24 25 26 27
4
5
6
7
8
9
For make-busy
For normal operation
60 ms synchronization clock ON
60 ms synchronization clock OFF
Not used
Not used
AP No. 04-15
AP No. 20-31
– 474 –
PN-SC03-B/PN-SC03-C (CSH)
11
12 13 14 15
28 29 30 31
A
B
C
D
E
F
in the SETTING POSITION col-
NWA-008841-001 Rev.5.0
CHECK
90ch3003.fm
JULY/1/2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents