SWITCH NAME
SW3 (Dip SW)
ON
1 2 3 4
JPS (Jumper pin)
JPR (Jumper pin)
The figure in the SWITCH NAME column and the position of
umn indicate the standard setting of the switch. When the switch is not set as shown by the figure and
, the setting of the switch varies with the system concerned.
SWITCH
SETTING
NUMBER
POSITION
ON
1
OFF
ON
2
OFF
ON
3
OFF
ON
4
OFF
RIGHT
LEFT
RIGHT
LEFT
FUNCTION
Set the equalizer according to the cable
length between the system and the
CSU.
SW
SW
SW
3-1
3-2
3-3
ON
ON
ON
ON
ON
OFF 40 - 80 m
ON
OFF
ON
ON
OFF
OFF 120 - 160 m
OFF
ON
ON
OFF
OFF
OFF Signal is not sent
FP No.16
FP No.01-03, 17-19
For mounting this card on PIM1 - PIM7
For mounting this card on PIM0
Neutral grounding on the receiving line
is provided.
Neutral grounding on the receiving line
is not provided.
– 379 –
PN-DAIA-A (DAIA)
CABLE
LENGTH
0 - 40 m
(0-131.2 ft.)
(131.2-262.5 ft.)
80 - 120 m
(262.5-394 ft.)
(394-525 ft.)
160 - 200 m
(525-656 ft.)
in the SETTING POSITION col-
Continued on next page