NEC NEAX 2000 IPS Installation Manual page 438

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

Lamp Indications
LAMP
COLOR
NAME
RUN
Green
CRC
Red
PCM
Red
FRM
Red
RMT
Red
AIS
Red
BL
Red
Switch Settings
SWITCH NAME
SENSE
(Rotary SW)
F
4
NOTE 1
MB (Toggle SW)
ON
NOTE 2
Flashes at 120 IPM while this card is operating normally.
Remains lit when detecting Cyclic Redundancy Checking (CRC) errors.
Remains lit when detecting PCM signal loss.
Remains lit when detecting Frame Alignment signal loss.
Remains lit when receiving Frame Alignment signal loss alarm from a
distant office.
Remains lit when a pattern of consecutive "1" is received. The distant
office transmits this signal for a loopback test.
B channel status
ON
OFF
Flash (60 IPM)
Flash (120 IPM) : 2 through 10 channels are busy
SWITCH
SETTING
NUMBER
POSITION
0-3
Not used
4-F
Set the switch to match the AP Number (04-31) to be
set by CM05.
SW1-4: ON
AP No.
SW1-4: OFF
SW No.
UP
DOWN
FUNCTION
: More than 10 channels are busy
: All channels are idle
: Only one channel is busy
FUNCTION
04 05 06 07
08 09 10
20 21 22 23
24 25 26
4
5
6
7
8
9
For make-busy
For normal operation
– 422 –
PN-24DTA-C (DTI)
11
12 13 14 15
27 28 29 30 31
A
B
C
D
E
F
Continued on next page
NWA-008841-001 Rev.5.0
CHECK
90ch3003.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents