NEC NEAX 2000 IPS Installation Manual page 97

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

(4)
When the system is two-frame configuration, the Installation cable of the right side frame can go
through the BASE of the left side frame.
Installation Cable Wiring for Two-Frame Configuration when –48 V DC Power Supply System
TO
–48 V DC
POWER SOURCE
CORD BUSH
INSTALLATION CABLE
G
–48 V
FG
– 81 –
CHAPTER 2 INSTALLATION
WIRING POWER CABLE TO TERMINALS
G
–48 V
FG
NWA-008841-001 Rev.5.0
BASE
TERMINAL
BLOCKS
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents