19-inch Rack Mounting Installation

Start
Checkup
before installation
Detaching
Side Cover/Side Panel
One PIM
Configuration
Multiple-Module
Configuration
Checking
End
• Check the site for installing the PBX with the work drawing to verify that the
required floor space is ensured and that service entrances and ducts for trunk/
extension cables, power cables and grounding conductors have been properly
worked at correct positions. See
Page
84,
Page 85
• Detach the SIDE COVER and SIDE PANEL of the Module for 19"RACK
BRACKET (A) mounting. For 19"RACK BRACKET (B), this procedure is not
required. See
"Detaching SIDE COVER/SIDE
• Mount the 19"RACK BRACKET (A) to the PIM. See
19"RACK BRACKET
• Mount the PIM with the 19"RACK BRACKET (A) to the 19-inch RACK. See
"Mounting PIM to 19-inch
• Mount the 19"RACK BRACKET (B) to the bottom-stack Module. See
nection of 19"RACK BRACKET
• Mount the 19"RACK BRACKET (A) to the top-stack PIM. See
of 19"RACK BRACKET
• Mount the modules with the 19" RACK BRACKET (A) and (B) to the 19-inch
RACK. See
"Mounting Multiple-Module to 19-inch
Page 109
NOTE:
The BATTM cannot be installed in the 19-inch RACK.
• Carefully review every step above to check that all necessary screws have been
properly placed and tightened.
"Floor Space"
(A)".
Page 106
Page 107
RACK".
(B)".
Page 106
(A)".
– 103 –
CHAPTER 2 INSTALLATION
INSTALLATION OF MAIN EQUIPMENT
and
"Cable Hole
Location".
PANEL".
Page 104
"Connection of
Page 108
"Connection
RACK".
NWA-008841-001 Rev.5.0
"Con-
90ch2001.fm
JULY/1/2006

Hide quick links: