Mechanical Installation; Figure 19: Placing The Bumpers - Mellanox Technologies SwitchX-2 MSX6005F-1BFS Hardware User Manual

12 port infiniband switch system
Table of Contents

Advertisement

SwitchX®-2 12 Port InfiniBand Switch System Hardware User Manual
• 1 – Harness DB9 to RJ-45 for connecting to the CONSOLE port for managed switches
only
• Documentation – QSG
• 1 – China RoHS statement
3.3

Mechanical Installation

Tools and Customer Supplied Parts:
• Phillips Screwdrivers #1 and #2
• ESD strap
• ESD mat
3.3.1
Table Top Installation
Included in the box is a bag with 4 rubber stick-on feet for table top installation.
1. Peel and stick the four rubber bumpers into the bottom of the switch. Place them in the round
circles.
Bottom of the switch
2. Place on a flat surface. Make sure the switch sits solid on the surface.
If anything is damaged or missing, contact your customer representative immediately.
For customer support go to:
www.mellanox.com
=>Support => Customer Support Portal Login
No installation kit comes with this switch. The installation kit must be ordered sepa-
rately. The order number is MSX60-DKIT.

Figure 19: Placing the Bumpers

• Grounding screw
• Grounding wire sufficient to reach a valid ground.
Mellanox Technologies
Rev 1.0
33

Advertisement

Table of Contents
loading

Table of Contents