3. Remove the two handles from the sides of the chassis.
4. Push the chassis into the rack until the faceplate is ~ 20cm (~ 8") from the vertical
support.
5. Put the rail slides onto the rails.
6. Slide the chassis further into the rack.
7. Slide the chassis all the way into the rack until the faceplate is touching the vertical
rack support. The caged nuts placed in the last procedure should line up with the
holes in the faceplate.
Mellanox Technologies

Figure 15: Raising the Chassis Using a Mechanical Lift

Figure 16: Put on the Rail Slide