Figure 14: Putting The Chassis In The Rack Using A Mechanical Lift; Figure 15: Place The Upper Bracket Offset - Mellanox Technologies MIS5300 Hardware Installation Manual

324-port infiniband qdr switchx switch platform
Table of Contents

Advertisement

InfiniBand Switch Platform Hardware User Manual

Figure 14: Putting the Chassis in the Rack Using a Mechanical Lift

Figure 15: Place the Upper Bracket Offset

2. Screw on the two Upper Bracket offsets onto the chassis using nine flat head screws
for each offset.
Mellanox Technologies
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchx is5300 gt series

Table of Contents