Figure 5: Screwing On The Rail; Figure 6: Inserting The Caged Nuts - Mellanox Technologies SX1012 User Manual

Switchx and switchx-2 series 1u switch systems
Hide thumbs Also See for SX1012:
Table of Contents

Advertisement

Clip the caged nuts into the holes in the rack on the side of the rack you will be sliding the
Step 3.
system into.
Slide the rail into the rail slide.
Step 4.
Using two of the M6 bolts for each corner, install the rails and rail slides in the rack. Do not
Step 5.
tighten the bolts yet.
Rev 1.4

Figure 5: Screwing on the Rail

5 screws per side are needed for the short system.
7 screws per side are needed for the standard system.
If using a torque screwdriver to tighten the screws, set it to 1.5±0.2 Nm.

Figure 6: Inserting the Caged Nuts

Mellanox Technologies
Side you will slide
the system into
Second side
Installation