Figure 5: Inserting The Caged Nuts; Figure 6: Slide The Rail Into The Rail Slide - Mellanox Technologies switchx MSX1035B-1BRR Installation Manual

36 port qsfp ethernet switch
Table of Contents

Advertisement

SwitchX 40GigE 1U Ethernet Switch Installation Guide
5.
Clip 6 caged nuts into the holes in the rack on the side of the rack you will be sliding the
switch into. Check that both sides of the switch, power side and connector side, are at the
same level in the rack.
6.
Clip 4 more caged nuts into the holes on the opposite side of the rack. Check that both sides
of the switch, left and right, are the same level in the rack.
7.
Slide the rail into the rail slide.
8.
Using two of the bolts for each corner install the rails and rail slides in the rack. Do not
tighten the bolts yet.

Figure 5: Inserting the Caged Nuts

Figure 6: Slide the Rail into the Rail Slide

This side of the rail kit goes on the side of the rack you will
slide the switch into. This is the same side of the switch that
will be next to the vertical support.
Side you will slide
the switch into
Second side
Mellanox Technologies
Rev 1.4
13

Advertisement

Table of Contents
loading

Table of Contents