Figure 15: Place Caged Nuts - Mellanox Technologies MIS5600Q-10DNC Installation Manual

648 port infiniband qdr switch platform
Hide thumbs Also See for MIS5600Q-10DNC:
Table of Contents

Advertisement

Rev 2.1
Place 8 caged nuts
between here and here
for the cable holders
Top of shelf
5.
Unscrew the lock-down bars.
6.
Place the chassis in front of the rack and as close as possible to the rack.
7.
Raise the chassis so that it is ~5cm above the shelf in the rack.
8.
Raise the hinged extension on the container floor.
9.
Lower the chassis until the hinged extension is sitting on the shelf extension.
10.
Push the chassis from the container to the shelf.
26

Figure 15: Place Caged Nuts

2 6
3
3
2 5
2
2 4
1
1
Mellanox Technologies
Chassis Installation

Advertisement

Table of Contents
loading

Table of Contents