TJ
MANUAL - NV3550 (Continued)
Fig. 55 FIFTH GEAR BEARING
1 - SHAFT SHOULDER
2 - FIFTH GEAR BEARING
Fig. 56 FIFTH GEAR
1 - FIFTH GEAR
2 - BEARING
(11) Install first gear bearing on output shaft (Fig.
57). Verify bearing is seated on shaft shoulder and is
properly joined.
(12) Install first gear on shaft and over bearing
with synchro cone facing up (Fig. 58).
MANUAL - NV3550
Fig. 57 FIRST GEAR BEARING
1 - FIRST GEAR BEARING
2 - SHAFT SHOULDER
3 - CUP
4 - PRESS BLOCKS
Fig. 58 FIRST GEAR
1 - FIRST GEAR
2 - CUP
3 - BEARING
21 - 47