Concluding Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

System board components

10.3.3.5 Concluding steps

Perform the following procedures to complete the task:
Ê Close the server blade as described in section
page
59.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
238
65.
96.
Upgrade and Maintenance Manual
"Closing the server blade" on
60.
"Closing the rack
"Enabling
BX920 S3

Advertisement

Table of Contents
loading

Table of Contents