Ce Conformity - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

Important information
Transporting the server
Only transport the device in its original packaging or in packaging that
protects it from impacts and jolts.
For the Japanese market, transporting the device in its original packaging
does not apply.
Do not unpack the device until it is at its installation location.
Never lift or carry the device by the handles on the front panel.
Notes on installing the server in the rack
Never lift the server into the rack using the handles on the front panel.
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical manual
for the corresponding rack. The technical manual is supplied with the
corresponding rack.
When installing the rack, make sure that the anti-tilt protection is correctly
fitted.
For safety reasons, no more than one unit may be removed from the rack at
any one time during installation and maintenance work.
If several units are simultaneously removed from the rack, there is a risk that
the rack could tip over.
The rack must be connected to the power supply by an authorized specialist
(electrician).
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the power
supply's fuse protection must comply with the requirements for non-
industrial power supply networks for the type A connector.
3.2

CE conformity

The system complies with the requirements of the EC directives
2004/108/EC regarding "Electromagnetic Compatibility" and
2006/95/EC "Low Voltage Directive". This is indicated by the CE
marking (CE = Communauté Européenne).
40
Upgrade and Maintenance Manual
BX920 S3

Advertisement

Table of Contents
loading

Table of Contents