Concluding Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

Main memory
8.4.5

Concluding steps

Perform the following procedures to complete the task:
Ê Reinstall the air cowls as described in section
page
181.
Ê If applicable, reinstall the mezzanine carrier as described in section
"Installing mezzanine cards" on page
Ê Close the server blade as described in section
page
59.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê If applicable, close the rack door as described in section
door" on page
Ê If available, update the system board BIOS to the latest version as described
in section
"Updating or recovering the system board BIOS and iRMC" on
page 77
(not applicable for the Japanese market).
Ê Enable boot watchdog functionality as described in section
watchdog functionality" on page
Ê Enable the replaced memory module(s) as described in section
replaced components in the system BIOS" on page
Ê Verify if the memory mode has been restored to its original state as
described in section
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
180
65.
"Verifying the memory mode" on page
96.
Upgrade and Maintenance Manual
"Installing the air cowls" on
130.
"Closing the server blade" on
89.
60.
"Closing the rack
"Enabling boot
"Enabling
90.
90.
"Enabling
BX920 S3

Advertisement

Table of Contents
loading

Table of Contents