Switching On The Server Blade - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

4.8

Switching on the server blade

V
CAUTION!
Before switching on the server blade, make sure the cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
PRIMERGY BX920 S3 server blade must not run while the cover is
removed.
Follow the safety instructions in chapter
page
33.
Figure 13: Power button on the front panel
Ê Press the On / Off button (1) to start up the server blade.
Ê Ensure that the power indicator (2) in the On / Off button is lit green.
I
For more information, refer to section
page
263.
BX920 S3
Upgrade and Maintenance Manual
Basic hardware procedures
"Important information" on
"Front panel indicators" on
63

Advertisement

Table of Contents
loading

Table of Contents