Preliminary Steps; Removing The Defective 2.5-Inch Hdd/Ssd Module; Installing The New 2.5-Inch Hdd/Ssd Module; Concluding Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

Hard disk drives / solid state drives
6.4.2

Preliminary steps

Perform the following procedures:
"Opening the rack door" on page 54
Ê
"Locating the defective server blade" on page 47
Ê
"Locating the defective component" on page 51
Ê
6.4.3

Removing the defective 2.5-inch HDD/SSD module

Ê Remove the HDD/SSD module as described in section
inch HDD/SSD module" on page
6.4.4

Installing the new 2.5-inch HDD/SSD module

Ê Install the HDD/SSD module as described in section
HDD/SSD module" on page
6.4.5

Concluding steps

Perform the following procedures:
"Closing the rack door" on page 65
Ê
Ê If applicable, please observe the notes on RAID rebuild in section
"Performing a RAID array rebuild" on page 97
112
109.
106.
Upgrade and Maintenance Manual
"Removing the 2.5-
"Installing the 2.5-inch
BX920 S3

Advertisement

Table of Contents
loading

Table of Contents