Handling Processor Heat Sinks; Required Tools; Preliminary Steps - Fujitsu PRIMERGY BX920 S3 Upgrade And Maintenance Manual

Server blade
Hide thumbs Also See for PRIMERGY BX920 S3:
Table of Contents

Advertisement

9.5

Handling processor heat sinks

Field Replaceable Units (FRU)
Average task duration: 15 minutes
9.5.1

Required tools

Preliminary and concluding steps: tool-less
Installing or removing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
9.5.2

Preliminary steps

Before installing, removing or replacing the processor heat sink, perform the
following steps:
Ê Shut down the server blade as described in section
server blade" on page
Ê Remove the server blade from the system unit as described in section
"Removing the server blade from the system unit" on page
Ê If necessary, remove the memory modules as described in section
"Removing a memory module" on page
Ê Open the server blade as described in section
on page
58.
BX920 S3
55.
Upgrade and Maintenance Manual
"Shutting down the
176.
"Opening the server blade"
Processors
57.
201

Advertisement

Table of Contents
loading

Table of Contents