10.1.5 Concluding steps
Perform the following procedures to complete the task:
Ê Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê Close the server blade as described in section
page
59.
Ê Reinstall and secure the server blade in the system unit as described in
section
"Installing the server blade in the system unit" on page
Ê Verify and update time settings as described in section
time settings" on page
Ê If applicable, close the rack door as described in section
door" on page
BX920 S3
91.
65.
Upgrade and Maintenance Manual
System board components
"Closing the server blade" on
60.
"Verifying the system
"Closing the rack
215